Our Garden Room Design & Installation Process

We stay with you from the first chat to keys in hand

An insight into our build process from start to finish. What happens, when and the detail that goes into your garden room. 

Our 6 Step Process

Throughout the whole process, you’ll be in direct contact with David and Ben who manage everything from the first call to your completion clean at the end and final sign off.

1

Consultation

Get in touch and tell us about your ideas, what you’d like the space for, rough size and budget. All very relaxed. A rough idea is all you need at this stage. 

2

Site visit & quote

If ideas and rough budget align, we’ll plan in a site visit to talk it all through, see the space and discuss options. We’ll then send through a clear, itemised quote.

3

Design

We’ll send across a floorplan and a photorealistic visual of your room. We can make any amends as necessary at this stage to the design, including any extras and customisations. 

4

Project confirmed

Quote and design signed off, your project is confirmed. We’ll agree on a start date and send across our contract, the project pack and first invoice. After this is paid, the wheels are put in motion to order all the materials and get everything lined up from our side. 

5

Installation starts

We get the foundations in and the main structure up in just a few days. Then comes more joinery work, electrics, plastering, flooring and decorating. The whole process takes around 3 weeks, which includes time for the plaster to dry properly.

6

Sign off & handover

Your finished garden room is all yours. We’ll send over your certifications and guarantees, including our 10 year structural guarantee for the build. Long term, we’re always here to provide any aftercare as needed. 

How we build your garden room

stainless steel ground screws being installed at new garden room site

Steel ground screw foundations

Incredibly strong, stable and load bearing. Screwed down into the ground with no need for excavation or concrete. 

close up of insulation in a sip panel

Highly insulated structure

Floor, walls and roof fully insulated to house standards. Help to keep your garden room warm in winter and cooler in the summer.

weatherproof breathable membrane on garden room being built before cladding installed

Sealed and watertight

Breathable membrane, an EPDM all-weather roof and double-glazed doors and windows as standard. 

garden room close up cladding and front elevation

Cladding & interior

External cladding and a crafted finish to the outside, plus electrics, flooring, plastering and painting inside.

Designing your dream garden room

Each garden room is built around you and your needs.

During step 3, we’ll send across a floorplan and photorealistic visual of your garden room before anything is set in stone. 

It’s during this point where you can make changes to the size, layout, cladding, doors, windows, glazing and lighting.

Once we’re all happy, the wheels are then set in motion for the build.  

design visual render of garden room before build

Aftercare

We're still here after the keys have been handed over

10 year guarantee

Covering the structure of your room, including the roof, cladding, and the doors and windows we fit.

Certificates supplied

You’ll receive your electrical certificates and guarantee paperwork at handover for your records.

Direct line still open

Your project WhatsApp group stays open after handover. Any questions or queries, just drop us a message.

Good to know before you start

How long does the whole process take?

Once your design is agreed, there’s usually a 3–4 week lead time while your room is made to order. Installation itself takes around 3 weeks on average, from the first ground screw going in to handing over the keys.

Very little really. Ground screw foundations means there’s no concrete pours or ground excavation. We’ll need access to an electrical socket for power, but apart from that we won’t need to disturb you. We keep the site as clean and tidy as can be. You’ll get regular updates in your WhatsApp group so you know who’s coming and when, but we say to assume someone will be on site from around 8am to 4pm each day.

No. As long as we have access to the garden and some form of outside plug, you can carry on with your day. We’ll agree access arrangements before we start and keep you updated throughout.

We’ll check all of this at the site visit. Narrow side pathways and rear access are common. We’ve taken SIP panels through ginnels and front dooors. Because the room is built in sections rather than delivered in one piece, most gardens aren’t a problem. If anything needs planning around, we’ll tell you before you commit.

Most garden rooms don’t, as they fall under permitted development. We check your property at the site visit and, if permission is needed, we can handle the application for you.